How Does A Demolition Survey Differ From A Management Survey
A demolition survey is required prior to any demolition to either all or part of a building. A demolition survey is carried out as a requirement under the Construction (Design and Management) Regulations and as stated in the guidance for Regulation 4 in Control of Asbestos Regulations 2012